Lapse
NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

2 cases of 53: critical or carrying no class, permit or violation, at Bronx, most overdue first.show all 53

2 days left

critical

due September 18, 2026

counted from permit expiry

275 Harlem River Park Bridge, Bronx

permit · job 201200422/03, permit PL, seq 07 · BIN 2009253

The work this permit covers

REMOVE AND INSTALL NEW DUCTWORK AND EXHAUST FANS FOR NEW SHBC LOCATION.INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 201200422/03 permit type PL
  • passexpiry knownexpiration date reads 2026-09-18
  • passjob openjob 201200422/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-18 (in 2 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 201200422/03 permit PL seq 07 at 275 HARLEM RIVER PARK BRIDGE, BRONX expires September 18, 2026. The work is: REMOVE AND INSTALL NEW DUCTWORK AND EXHAUST FANS FOR NEW SHBC LOCATION. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993021:critical:FILE:84ca69b0f2

no clock on this one

no class

no date on record

1165 Cromwell Avenue, Bronx

violation · type C, violation V051925CSR0401NS · BIN 2003022

When is the response due for construction violation V051925CSR0401NS at 1165 Cromwell Avenue?

What DOB wrote on it

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 DAMAGED JOINTS,DEFECTED WINDOW SEALANT.EXP3 AT JEROME AVE DAMAGED JOIN TS ON EXTERIOR WALLS AND ALONG COPING STONE AREA.ROOF BROKEN COPING ST ONE.NOTE MULTIPLE BROKEN MASONRY AT EXP1 AND 3 CONCRETE FENCE.REMEDY:M AINTAIN BUILDING.REPAIR AND/OR REPLACE

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2025-05-19
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2791707:none:DECIDE:a62bf1b007

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:57 UTC