Lapse
NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

35 cases of 53: lapsed or critical, draft ready or your call, permit, most overdue first.show all 53

The other 28 need an answer from you first and cannot be batched.

110 days late

lapsed

due May 29, 2026

counted from permit expiry

133 Navy Walk, Brooklyn

permit · job 340111765/01, permit PL, seq 09 · BIN 3257041

Was any plumbing work done at 133 NAVY WALK, BROOKLYN (job 340111765/01) after the permit expired on May 29, 2026?

The work this permit covers

LAUNDRY ROOM UPGRADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 09 is the newest issued for job 340111765/01 permit type PL
  • passexpiry knownexpiration date reads 2026-05-29
  • passjob openjob 340111765/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-05-29 (110 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 110 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3989946:lapsed:DECIDE:8f7987a4d0

106 days late

lapsed

due June 2, 2026

counted from permit expiry

1137 Herkimer Street, Brooklyn

permit · job 302575844/03, permit PL, seq 09 · BIN 3042157

Was any plumbing work done at 1137 HERKIMER STREET, BROOKLYN (job 302575844/03) after the permit expired on June 2, 2026?

The work this permit covers

K271-REPLACE SUMP PUMPS,PORTIONS OF CW/HW ,WASTE & STORM PIPING, GAS, S/W PIPING.REPLACE ELECTRIC HWH & RELATED PIPING, GAS METER ASSEMBLY.REMOVE HW STEAM COIL STORAGE TANK & ASSOC PIPING/CONTROLS, CIRCULATING PUMP & ASSOC PIPING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 09 is the newest issued for job 302575844/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-02
  • passjob openjob 302575844/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-02 (106 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 106 days ago against a 730 day renewal window
  • failanswer still appliesanswered 'no' on 2026-09-14T14:04:57Z against a different reading of this permit; DOB's record has moved since, so the question stands again
recorded, and you can change it

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990014:lapsed:DECIDE:186c2487e3

106 days late

lapsed

due June 2, 2026

counted from permit expiry

140 West 102nd Street, Manhattan

permit · job 103651736/02, permit PL, seq 06 · BIN 1055911

Was any plumbing work done at 140 WEST 102ND STREET, MANHATTAN (job 103651736/02) after the permit expired on June 2, 2026?

The work this permit covers

REMOVE AND REINSTALL LAB EXHAUST FANS AND VENTILATORS, OUTDOOR CONDENSING UNITS WITH NEW SUPPORTS AND PIPING, (5) ROOF TOP UNITS. PROTECT FUEL PIPING IN PLACE AND PROVIDE NEW SUPPORT. REMOVE ROOF DRAINS AND REPLACE WITH NEW. RELOCATE ROOF VENTS AWAY FROM PARAPET WALLS. REMOVE EXISTING GAS PIPING AND PROVIDE NEW PIPING ON RAISED SUPPORTS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 103651736/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-02
  • passjob openjob 103651736/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-02 (106 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 106 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990016:lapsed:DECIDE:61e128f104

102 days late

lapsed

due June 6, 2026

counted from permit expiry

100 Attorney Street, Manhattan

permit · job 104214002/03, permit PL, seq 04 · BIN 1004080

Was any plumbing work done at 100 ATTORNEY STREET, MANHATTAN (job 104214002/03) after the permit expired on June 6, 2026?

The work this permit covers

PS 142M -ROOF DRAIN REPLACEMENT TO FACILITATE THE REPLACEMENT OF THE EXISTING BUILT UP ROOFING SYSTEM. RE FLASH 8 VENT STACKS. AS PER PLANS FILED HEREWITH.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 104214002/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 104214002/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990185:lapsed:DECIDE:f2bf737d4e

102 days late

lapsed

due June 6, 2026

counted from permit expiry

968 Cauldwell Avenue, Bronx

permit · job 201204507/04, permit PL, seq 03 · BIN 2004498

Was any plumbing work done at 968 CAULDWELL AVENUE, BRONX (job 201204507/04) after the permit expired on June 6, 2026?

The work this permit covers

P.S. 146-X SUBSEQUENT FILING OF CIVIL AND SITE PLUMBING WORK TYPES. SITE IMPROVEMENTS ASSOCIATED WITH BUILDING ADDITION

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 201204507/04 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 201204507/04 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990187:lapsed:DECIDE:4408807576

102 days late

lapsed

due June 6, 2026

counted from permit expiry

968 Cauldwell Avenue, Bronx

permit · job 201204507/03, permit PL, seq 03 · BIN 2004498

Was any plumbing work done at 968 CAULDWELL AVENUE, BRONX (job 201204507/03) after the permit expired on June 6, 2026?

The work this permit covers

P.S. 146-X SUBSEQUENT FILING OF PLUMBING & MECHANICAL WORK TYPES ASSOCIATED TO THE SCHOOL ADDITION. OT-LIGHTING WORK ASSOCIATED WITH BUILDING ADDITION, SELECTIVE LOW VOLTAGE WORK IN THE EXISTING BUILDING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 201204507/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 201204507/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990186:lapsed:DECIDE:7f6a16bd7e

102 days late

lapsed

due June 6, 2026

counted from permit expiry

760 Prospect Place, Brooklyn

permit · job 322050230/02, permit PL, seq 03 · BIN 3330794

Was any plumbing work done at 760 PROSPECT PLACE, BROOKLYN (job 322050230/02) after the permit expired on June 6, 2026?

The work this permit covers

REPLACE AREAWAY DRAINS AND PIPES, REPLACE SUMP PUMPS IN CELLAR, REPLACE DETERIORATED SANITARY/STORM WATER PIPES, REPLACE FAN, FAN SUPPORT AND PHLENUM ON ROOF, REPLACE RADIATOR AND CONDENSATE PIPES IN BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 322050230/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 322050230/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990188:lapsed:DECIDE:7ba026ad24

98 days late

lapsed

due June 10, 2026

counted from permit expiry

16 Clarkson Street, Manhattan

permit · job 104214137/02, permit PL, seq 02 · BIN 1009757

Was any plumbing work done at 16 CLARKSON STREET, MANHATTAN (job 104214137/02) after the permit expired on June 10, 2026?

The work this permit covers

REPLACE(2) H&V UNITS AND ONE EXHAUST FAN LOCATED AND PROVIDE DUCTWORK AND STEAM/CONDENSATE PIPING FOR THE EQUIPMENT. REPLACE ALL STEAM AND CONDENSATE PIPING. REPLACE ALL WALL-MOUNTED RADIATORS AND HEATING PIPE COILS IN THE BASEMENT. REMOVE AND RE-INSTALL(2)EXISTING AIR-COOLED SPLIT SYSTEMS IN COORDINATION WITH ROOF REPLACEMENT.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 02 is the newest issued for job 104214137/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-10
  • passjob openjob 104214137/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-10 (98 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 98 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990242:lapsed:DECIDE:bd7fbe713d

96 days late

lapsed

due June 12, 2026

counted from permit expiry

65 Court Street, Brooklyn

permit · job 302574925/02, permit PL, seq 07 · BIN 3002557

Was any plumbing work done at 65 COURT STREET, BROOKLYN (job 302574925/02) after the permit expired on June 12, 2026?

The work this permit covers

REMOVE AND REPLACE EXISTING INSULATION WITH NEW, WITHIN FRESH AIR INTAKE SHAFT. PROVIDE HEAT TRACING FOR PIPING WITHIN FRESH AIR INTAKE SHAFT. EXTEND EXISTING FAI FOR SEWER EJECTOR PIT.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 302574925/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-12
  • passjob openjob 302574925/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-12 (96 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 96 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990374:lapsed:DECIDE:7ccbc1ac25

95 days late

lapsed

due June 13, 2026

counted from permit expiry

2703 Webster Avenue, Bronx

permit · job 201207826/03, permit PL, seq 04 · BIN 2113630

Was any plumbing work done at 2703 WEBSTER AVENUE, BRONX (job 201207826/03) after the permit expired on June 13, 2026?

The work this permit covers

REMOVE (5) EX. AREA DRAINS AND ASSOCIATED PIPING AND REPLACE IN KIND. REMOVE EX. 3" DRAIN PIPE BELOW ROOF UP TO 6" MAIN. REPLACE IN KIND AND RECONNECT.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 201207826/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-13
  • passjob openjob 201207826/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-13 (95 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 95 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990421:lapsed:DECIDE:03264db940

92 days late

lapsed

due June 16, 2026

counted from permit expiry

82-01 101 Ave., Queens

permit · job 421105066/03, permit PL, seq 08 · BIN 4188214

Was any plumbing work done at 82-01 101 AVE., QUEENS (job 421105066/03) after the permit expired on June 16, 2026?

The work this permit covers

BOILER CONVERSION AT PS 64 QUEENS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 421105066/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-16
  • passjob openjob 421105066/03 is PERMIT ISSUED - PARTIAL JOB
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-16 (92 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 92 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990473:lapsed:DECIDE:b9a5debd9c

89 days late

lapsed

due June 17, 2026

counted from permit expiry

101 Park Avenue, Brooklyn

permit · job 322050668/02, permit PL, seq 04 · BIN 3057942

Was any plumbing work done at 101 Park Avenue after June 17, 2025, when permit PL seq 04 expired?

The work this permit covers

REPLACE ROOFING OF SELETIVE ROOFS AND 9 ROOFS/CANOPIES DRAINS, REPAIR BRICK MA SONRY PARAPET WALLS AND METAL COPING, MASONRY FACADE REPOINTING, REPLACE/ REPA IR SHELF ANGLES AND WINDOWS LINTELS AND SILLS. REPLACE BRICK MASONRY ENCLOSER OF EXIST, CHIMENY FROM ROOF SLAB AND ABOVE, REPLACE BASEMENT FLOORING, REPLAC E CONCRETE PAVEMENT AND RAILING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 322050668/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-17
  • passjob openjob 322050668/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-17 (89 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 89 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990520:lapsed:DECIDE:350f6d9d24

86 days late

lapsed

due June 20, 2026

counted from permit expiry

6302 Avenue U, Brooklyn

permit · job 302582104/01, permit PL, seq 08 · BIN 3326821

Was any plumbing work done at 6302 Avenue U after June 20, 2025, when permit PL seq 08 expired?

The work this permit covers

EXTERIOR BUILDING REHABILITATION. ROOF REPLACEMENT. SELECTIVE REPLACEMENT OF PARAPETS AND FACE BRICK. REPLACEMENT OF SECURITY LIGHTING IN AREAS OF WORK. ASSOCIATED INTERIOR REPAIRS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302582104/01 permit type PL
  • passexpiry knownexpiration date reads 2026-06-20
  • passjob openjob 302582104/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-20 (86 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 86 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990596:lapsed:DECIDE:b7578f3edc

86 days late

lapsed

due June 20, 2026

counted from permit expiry

31 New York Avenue, Brooklyn

permit · job 322053326/02, permit PL, seq 04 · BIN 3053993

Was any plumbing work done at 31 New York Avenue after June 20, 2025, when permit PL seq 04 expired?

The work this permit covers

REMOVE AND REPLACE ROOF EXHAUST FANS AND VENTILATORS WITH DAMPERS. REMOVE AND REINSTALL CODENSING TO ACCOMODATE MASONRY WORK. PROVIDE TEMP SPOT COOLER. CLEAN, TEST DRAIN, REMOVE OBSTRUCTIONS IN EXISTING STORM DRAIN PIPING FROM ROOF TO STREET MAIN. REMOVE AND REPLACE ROOF DRAIN ASSEMBLY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 322053326/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-20
  • passjob openjob 322053326/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-20 (86 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 86 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990597:lapsed:DECIDE:aa242603ec

83 days late

lapsed

due June 23, 2026

counted from permit expiry

6302 Avenue U, Brooklyn

permit · job 302574042/02, permit PL, seq 08 · BIN 3326821

Was any plumbing work done at 6302 Avenue U after June 23, 2025, when permit PL seq 08 expired?

The work this permit covers

PS 236- REPLACEMENT OF (1) DRINKING FOUNTAIN, 10' STORM DRAINAGE PIPING. REMOVE PORTION OF COLD WATER AND SANITARY PIPING. NEW TRENCH DRAINS, CATCH BASINS & DETENTION TANKS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302574042/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-23
  • passjob openjob 302574042/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-23 (83 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 83 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990685:lapsed:DECIDE:6afd3003f6

80 days late

lapsed

due June 26, 2026

counted from permit expiry

3673 3rd Avenue, Bronx

permit · job 240228981/01, permit PL, seq 06 · BIN 2092079

Was any plumbing work done at 3673 3rd Avenue after June 26, 2025, when permit PL seq 06 expired?

The work this permit covers

REPLACE EXISTING BOILERS & ASSOCIATED PIPING. PROVIDE NEW CONDENSING HOT WATER HEATER & ASSOCIATED PIPING & FLUES.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 240228981/01 permit type PL
  • passexpiry knownexpiration date reads 2026-06-26
  • passjob openjob 240228981/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-26 (80 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 80 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990853:lapsed:DECIDE:a7f7e6157a

76 days late

lapsed

due June 30, 2026

counted from permit expiry

351 West 18th Street, Manhattan

permit · job 103652138/02, permit PL, seq 05 · BIN 1013096

Was any plumbing work done at 351 West 18th Street after June 30, 2025, when permit PL seq 05 expired?

The work this permit covers

REPLACE EXISTING ROOFTOP INTAKES/EXHAUSTS AND RELOCATE THREE OUTDOOR UNITS AS REQUIRED FOR ROOF REPLACEMENT. REPLACE 22 ROOF DRAINS AND 1 AREA DRAIN ON EXISTING ROUGHING. RELOCATE EXISTING VENT PENETRATIONS AWAY FROM PARAPET WALLS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 05 is the newest issued for job 103652138/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-30
  • passjob openjob 103652138/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-30 (76 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 76 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990918:lapsed:DECIDE:af284ff086

75 days late

lapsed

due July 1, 2026

counted from permit expiry

7115 15 Avenue, Brooklyn

permit · job 322050711/03, permit PL, seq 03 · BIN 3157760

Was any plumbing work done at 7115 15 Avenue after July 1, 2025, when permit PL seq 03 expired?

The work this permit covers

REPLACE 6 SCUPPERS WITH STORM LEADERS, REPLACE 4 ROOF DRAINS AND 9 LIGHT FIXTURES

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 322050711/03 permit type PL
  • passexpiry knownexpiration date reads 2026-07-01
  • passjob openjob 322050711/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-01 (75 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 75 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990975:lapsed:DECIDE:1767ef9029

62 days late

lapsed

due July 14, 2026

counted from permit expiry

2060 Lafayette Avenue, Bronx

permit · job 201207906/02, permit PL, seq 04 · BIN 2022289

Was any plumbing work done at 2060 Lafayette Avenue after July 14, 2025, when permit PL seq 04 expired?

The work this permit covers

FILING ALT 2 PLUMBING FOR EXISTING BUILDING IN CONJUNCTION WITH NEW PUBLIC SCHOOL BUILDING AT PS138X.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 201207906/02 permit type PL
  • passexpiry knownexpiration date reads 2026-07-14
  • passjob openjob 201207906/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-14 (62 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 62 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991265:lapsed:DECIDE:ce7aef962b

59 days late

lapsed

due July 17, 2026

counted from permit expiry

459 East 176th Street, Bronx

permit · job 201199522/01, permit PL, seq 06 · BIN 2009540

Was any plumbing work done at 459 East 176th Street after July 17, 2025, when permit PL seq 06 expired?

The work this permit covers

MASONRY REPAIRS, PARAPET WALL REPLACEMENT, CHEMICAL GROUT INJECTION, CONCRETE SIDEWALK REPLACEMENT, PARTIAL ROOF REPLACEMENT, RELOCATION OF ROOF DRAINS AND VENT PIPES, WINDOW REPLACEMENT, INTERIOR PLASTER REPAIR

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 201199522/01 permit type PL
  • passexpiry knownexpiration date reads 2026-07-17
  • passjob openjob 201199522/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-17 (59 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 59 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991388:lapsed:DECIDE:b2a6deb845

55 days late

lapsed

due July 21, 2026

counted from permit expiry

1964 Yates Avenue, Bronx

permit · job 201204393/05, permit PL, seq 04 · BIN 2130474

Was any plumbing work done at 1964 Yates Avenue after July 21, 2025, when permit PL seq 04 expired?

The work this permit covers

190388 - HEREWITH FILING SUBSEQUENT EXTERIOR PLUMBING/CIVIL APPLICATIONS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 201204393/05 permit type PL
  • passexpiry knownexpiration date reads 2026-07-21
  • passjob openjob 201204393/05 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-21 (55 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 55 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991503:lapsed:DECIDE:1ad4a4cafe

47 days late

lapsed

due July 29, 2026

counted from permit expiry

47-01 111th Street, Queens

permit · job 421628395/02, permit PL, seq 03 · BIN 4441124

The work this permit covers

HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK. INCLUDING KITCHEN RANGEHOOD VENTILATION SYSTEM AS PER PLANS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 421628395/02 permit type PL
  • passexpiry knownexpiration date reads 2026-07-29
  • passjob openjob 421628395/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-29 (47 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 47 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T13:28:50Z). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 421628395/02 permit PL seq 03 at 47-01 111th Street, Queens expired July 29, 2025. The work is mechanical and plumbing work including kitchen rangehood ventilation system as per plans. The permit lapsed 47 days ago but remains within the 730-day renewal window. Renew it in DOB NOW: Build or eFiling before the renewal window closes. If the scope has not changed, the permit applicant can renew through eFiling with the standard $130 renewal fee and no penalty; if anything changed, file a completed PW2 at the borough office. DOB waives the unpermitted work penalty where no work was performed after expiration. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991806:lapsed:FILE:37c32155dd

47 days late

lapsed

due July 29, 2026

counted from permit expiry

1776 Story Avenue, Bronx

permit · job 220630011/01, permit PL, seq 05 · BIN 2092748

Was any plumbing work done at 1776 Story Avenue after July 29, 2025, when permit PL seq 05 expired?

The work this permit covers

GENERAL RENOVATION FOR THE EXISTING COMMUNITY CENTER. NO CHANGE IN USES, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 05 is the newest issued for job 220630011/01 permit type PL
  • passexpiry knownexpiration date reads 2026-07-29
  • passjob openjob 220630011/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-29 (47 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 47 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991792:lapsed:DECIDE:d1e7709fc3

34 days late

lapsed

due August 11, 2026

counted from permit expiry

60-85 Catalpa Avenue, Queens

permit · job 421901188/02, permit PL, seq 03 · BIN 4085173

The work this permit covers

INSTALLATION OF NEW TURF AND UNDER DRAINAGE. PARTIAL REPLACEMENT OF STORM DRAINAGE SYSEM IN PLAYGROUND.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 421901188/02 permit type PL
  • passexpiry knownexpiration date reads 2026-08-11
  • passjob openjob 421901188/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-11 (34 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 34 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T14:11:43Z). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 421901188/02 permit PL seq 03 at 60-85 Catalpa Avenue, Queens expired August 11, 2025. The work is installation of new turf and under drainage, partial replacement of storm drainage system in playground. No work was performed after the permit expired. Renew this permit in DOB NOW: Build or eFiling before August 11, 2027. The standard renewal fee is $130. If the work changed, bring a completed PW2 to the borough office. DOB waives the unpermitted work penalty where nothing was done after expiration. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992086:lapsed:FILE:9d64e889bc

32 days late

lapsed

due August 13, 2026

counted from permit expiry

345 Chambers Street, Manhattan

permit · job 104214066/01, permit PL, seq 02 · BIN 1084587

Was any plumbing work done at 345 Chambers Street after August 13, 2025, when permit PL seq 02 expired?

The work this permit covers

M477 - REPLACEMENT OF TWO (2) 400 TON COOLING TOWER CELLS AND THREE (3) AIR HANDLERS INSTALLATION OF SECONDARY RPZ AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 02 is the newest issued for job 104214066/01 permit type PL
  • passexpiry knownexpiration date reads 2026-08-13
  • passjob openjob 104214066/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-13 (32 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 32 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992164:lapsed:DECIDE:86f0611aa7

26 days late

lapsed

due August 19, 2026

counted from permit expiry

450 Pacific Street, Brooklyn

permit · job 321068214/01, permit PL, seq 06 · BIN 3001183

Was any plumbing work done at 450 Pacific Street after August 19, 2025, when permit PL seq 06 expired?

The work this permit covers

REPLACE ROOF DRAINS, REPAIR MECHANICAL ROOF VENTS, IN CONJUNCTION WITH PREVIOUSLY APPROVED PROJECT DOB# 302586690.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 321068214/01 permit type PL
  • passexpiry knownexpiration date reads 2026-08-19
  • passjob openjob 321068214/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-19 (26 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 26 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992297:lapsed:DECIDE:5e835badc7

24 days late

lapsed

due August 21, 2026

counted from permit expiry

1619 Boston Road, Bronx

permit · job 201207933/02, permit PL, seq 02 · BIN 2009867

Was any plumbing work done at 1619 Boston Road after August 21, 2025, when permit PL seq 02 expired?

The work this permit covers

REPLACEMENT OF 8 DRAINS AT SAME LOCATION. REPLACEMENT OF 10 FT. OF STORM PIPING IN CELLAR

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 02 is the newest issued for job 201207933/02 permit type PL
  • passexpiry knownexpiration date reads 2026-08-21
  • passjob openjob 201207933/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-21 (24 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 24 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992344:lapsed:DECIDE:0ab0293119

16 days late

lapsed

due August 29, 2026

counted from permit expiry

131-10 97th Avenue, Queens

permit · job 421099536/04, permit PL, seq 07 · BIN 4200233

Was any plumbing work done at 131-10 97th Avenue after August 29, 2025, when permit PL seq 07 expired?

The work this permit covers

REMOVE EXISTING 3' LP GAS SERVICE REPLACE WITH NEW 3" HP GAS SERVICE, REMOVE EXISTING STEAM GENERATED HOT WATER HEATER AND REPLACE WITH NEW GAS FIRED HWH. INSTALL ONE TEMP. ELECTRIC HOT WATER HEATER REMOVE 1 SIMPLEX SUMP PUMP AND INSTALL 1 NEW DUPLEX. AS PER PLANS FILED HEREWITH.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 421099536/04 permit type PL
  • passexpiry knownexpiration date reads 2026-08-29
  • passjob openjob 421099536/04 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-29 (16 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 16 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992505:lapsed:DECIDE:2552f2e61f

10 days late

lapsed

due September 4, 2026

counted from permit expiry

36-41 28th Street, Queens

permit · job 421899976/04, permit PL, seq 04 · BIN 4004156

Was any plumbing work done at 36-41 28th Street after September 4, 2025, when permit PL seq 04 expired?

The work this permit covers

Q204-REPLACE GAS VENTS WITH NEW. REPLACE ROOF DRAINS WITH NEW.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 421899976/04 permit type PL
  • passexpiry knownexpiration date reads 2026-09-04
  • passjob openjob 421899976/04 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-04 (10 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 10 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992634:lapsed:DECIDE:b4ebf9269b

5 days late

lapsed

due September 9, 2026

counted from permit expiry

1560 Purdy Street, Bronx

permit · job 201200770/01, permit PL, seq 07 · BIN 2041247

Was any plumbing work done on this site after the permit expired?

The work this permit covers

FULL PROGRAM ACCESSIBILITY INCLUDES THE RENOVATION AND MODIFICATION OF EXISTING CLASSROOMS (AREA OF RESCUE ASSISTANCE, EGRESS STAIRS, BATHROOMS AND DRINKING FOUNTAINS PER NYCSCA ACCESSIBILITY ACT (ADA) AND 2009 ICC/ANSI A117.1 GUIDELINES.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 201200770/01 permit type PL
  • passexpiry knownexpiration date reads 2026-09-09
  • passjob openjob 201200770/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-09 (5 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 5 days ago against a 730 day renewal window
  • failanswer still appliesanswered 'no' on 2026-09-14T14:02:58+00:00 against a different reading of this permit; DOB's record has moved since, so the question stands again
recorded, and you can change it

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992723:lapsed:DECIDE:e89430e3ec

3 days late

lapsed

due September 11, 2026

counted from permit expiry

850 Grand Street, Brooklyn

permit · job 302582729/02, permit PL, seq 08 · BIN 3325733

The work this permit covers

EXTERIOR LIGHTING REPLACEMENT, REMOVE AND REINSTALLED ROOFTOP MECHANICAL, REPLACE MECHANICAL AS INDICATED, REPLACE ROOF DRAINS

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302582729/02 permit type PL
  • passexpiry knownexpiration date reads 2026-09-11
  • passjob openjob 302582729/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-11 (3 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 3 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T14:02:09+00:00). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302582729/02 permit PL seq 08 at 850 Grand Street, Brooklyn expired September 11, 2026. The work is exterior lighting replacement, remove and reinstall rooftop mechanical, replace mechanical as indicated, replace roof drains. The permit lapsed 3 days ago. Because no work was performed after the permit expired, DOB waives the unpermitted work penalty under 1 RCNY 102-04, so this is a clean renewal with the standard fee and no penalty to clear first. Renew it in DOB NOW: Build or eFiling before September 11, 2028 (730 days from expiration). A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office. The renewal fee is $130. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992811:lapsed:FILE:24d1cfcae8

due today

critical

due September 15, 2026

counted from permit expiry

240 Second Avenue, Manhattan

permit · job 104213922/03, permit PL, seq 04 · BIN 1020416

The work this permit covers

PROVIDE NEW STEAM CONVECTOR. REMOVE AND REINSTALL SPLIT AC UNIT CONDENSERS IN CELLAR. REPLACE FOUR AREA DRAINS, ONE FLOOR DRAIN, DUPLEX SUMP PUMP, AND HOUSE TRAP IN CELLAR.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 104213922/03 permit type PL
  • passexpiry knownexpiration date reads 2026-09-15
  • passjob openjob 104213922/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-15 (in 0 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 104213922/03 permit PL seq 04 at 240 SECOND AVENUE, MANHATTAN expires 2026-09-15. The work is provide new steam convector, remove and reinstall split AC unit condensers in cellar, replace four area drains, one floor drain, duplex sump pump, and house trap in cellar. Renew before the expiry date in the system it was issued in, DOB NOW: Build or eFiling. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992876:critical:FILE:5137315a2f

2 days left

critical

due September 18, 2026

counted from permit expiry

101 Park Avenue, Brooklyn

permit · job 302580767/04, permit PL, seq 11 · BIN 3057942

The work this permit covers

P.S.265-K:REMOVE EXIST. 3"GAS SERVICE AT NORTH OXFORD ST.,INSTALL NEW 4"GAS SERVICE 2 METER ASSEMBIES AT PARK AVENUE,1 TEMP. ELECT.HWH,1 GAS FIRED HWH,1RPZ 1 DUMPLEX SUMP PUMP,2 CIRC.PUMPS,REPLACE 1 AREAWAY DRAINS &3 FD,2 NEW FD,NEW GAS VENTS.NEW GAS PIPING AND ASSOCIATED FITTINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 11 is the newest issued for job 302580767/04 permit type PL
  • passexpiry knownexpiration date reads 2026-09-18
  • passjob openjob 302580767/04 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-18 (in 2 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302580767/04 permit PL seq 11 at 101 PARK AVENUE, BROOKLYN expires September 18, 2026. The work is: P.S.265-K: REMOVE EXIST. 3"GAS SERVICE AT NORTH OXFORD ST., INSTALL NEW 4"GAS SERVICE 2 METER ASSEMBIES AT PARK AVENUE, 1 TEMP. ELECT. HWH, 1 GAS FIRED HWH, 1RPZ 1 DUMPLEX SUMP PUMP, 2 CIRC. PUMPS, REPLACE 1 AREAWAY DRAINS & 3 FD, 2 NEW FD, NEW GAS VENTS. NEW GAS PIPING AND ASSOCIATED FITTINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993023:critical:FILE:b3bc5ab934

2 days left

critical

due September 18, 2026

counted from permit expiry

275 Harlem River Park Bridge, Bronx

permit · job 201200422/03, permit PL, seq 07 · BIN 2009253

The work this permit covers

REMOVE AND INSTALL NEW DUCTWORK AND EXHAUST FANS FOR NEW SHBC LOCATION.INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 201200422/03 permit type PL
  • passexpiry knownexpiration date reads 2026-09-18
  • passjob openjob 201200422/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-18 (in 2 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 201200422/03 permit PL seq 07 at 275 HARLEM RIVER PARK BRIDGE, BRONX expires September 18, 2026. The work is: REMOVE AND INSTALL NEW DUCTWORK AND EXHAUST FANS FOR NEW SHBC LOCATION. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993021:critical:FILE:84ca69b0f2

6 days left

critical

due September 22, 2026

counted from permit expiry

207 Bushwick Avenue, Brooklyn

permit · job 302586645/02, permit PL, seq 06 · BIN 3071024

The work this permit covers

REMOVE AND REPLACE EXISTING ROOF MOUNTED CONDENSING UNIT AND INDOOR A/C UNIT. PROVIDE PRE-FAB ROOF CURBS, INSULATED REFRIGERANT AND DRAIN PIPING. REMOVE AND REPLACE ROOF DRAINS AND AREAWAY DRAINS WITH ASSOCIATED PIPING. REMOVE AND REPLACE EXISTING BOILER ROOM SUMP PUMP.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 302586645/02 permit type PL
  • passexpiry knownexpiration date reads 2026-09-22
  • passjob openjob 302586645/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-22 (in 6 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302586645/02 permit PL seq 06 at 207 BUSHWICK AVENUE, BROOKLYN expires September 22, 2026. The work is: REMOVE AND REPLACE EXISTING ROOF MOUNTED CONDENSING UNIT AND INDOOR A/C UNIT. PROVIDE PRE-FAB ROOF CURBS, INSULATED REFRIGERANT AND DRAIN PIPING. REMOVE AND REPLACE ROOF DRAINS AND AREAWAY DRAINS WITH ASSOCIATED PIPING. REMOVE AND REPLACE EXISTING BOILER ROOM SUMP PUMP. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993081:critical:FILE:4e82c51b11

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:49 UTC