53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

1 case of 53: critical or due, permit or violation, at Staten Island, most overdue first.show all 53

28 days left

due

due October 14, 2026

counted from permit expiry

290 St. Marks Place, Staten Island

permit · job 500871103/02, permit PL, seq 08 · BIN 5000314

The work this permit covers

REMOVE AND REINSTALL EXISTING GRAVITY VENTILATORS ON ROOF. REINSTALL ON RAISED CURB, PROVIDE NEW WELDED DUCTWORK FROM RAISED FANS TO EXISTING RISERS. PROVE NEW PENTHOUSE LOUVER ABOVE ELEVATOR MACHINE ROOM AND REPLACE EXISTING SPLIT AC UNIT SERVING MDF ROOM. REPLACE EXISTING AREAWAY DRAINS AND TERRACE DRAINS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 500871103/02 permit type PL
  • passexpiry knownexpiration date reads 2026-10-14
  • passjob openjob 500871103/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-10-14 (in 28 days), class due against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 500871103/02 permit PL seq 08 at 290 ST. MARKS PLACE, STATEN ISLAND expires October 14, 2026. The work is: REMOVE AND REINSTALL EXISTING GRAVITY VENTILATORS ON ROOF. REINSTALL ON RAISED CURB, PROVIDE NEW WELDED DUCTWORK FROM RAISED FANS TO EXISTING RISERS. PROVE NEW PENTHOUSE LOUVER ABOVE ELEVATOR MACHINE ROOM AND REPLACE EXISTING SPLIT AC UNIT SERVING MDF ROOM. REPLACE EXISTING AREAWAY DRAINS AND TERRACE DRAINS. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993569:due:FILE:05d83bd612

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:58 UTC