Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

5 cases of 53: lapsed or due, at Manhattan, most overdue first.show all 53

106 days late

lapsed

due June 2, 2026

counted from permit expiry

140 West 102nd Street, Manhattan

permit · job 103651736/02, permit PL, seq 06 · BIN 1055911

Was any plumbing work done at 140 WEST 102ND STREET, MANHATTAN (job 103651736/02) after the permit expired on June 2, 2026?

The work this permit covers

REMOVE AND REINSTALL LAB EXHAUST FANS AND VENTILATORS, OUTDOOR CONDENSING UNITS WITH NEW SUPPORTS AND PIPING, (5) ROOF TOP UNITS. PROTECT FUEL PIPING IN PLACE AND PROVIDE NEW SUPPORT. REMOVE ROOF DRAINS AND REPLACE WITH NEW. RELOCATE ROOF VENTS AWAY FROM PARAPET WALLS. REMOVE EXISTING GAS PIPING AND PROVIDE NEW PIPING ON RAISED SUPPORTS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 103651736/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-02
  • passjob openjob 103651736/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-02 (106 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 106 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990016:lapsed:DECIDE:61e128f104

102 days late

lapsed

due June 6, 2026

counted from permit expiry

100 Attorney Street, Manhattan

permit · job 104214002/03, permit PL, seq 04 · BIN 1004080

Was any plumbing work done at 100 ATTORNEY STREET, MANHATTAN (job 104214002/03) after the permit expired on June 6, 2026?

The work this permit covers

PS 142M -ROOF DRAIN REPLACEMENT TO FACILITATE THE REPLACEMENT OF THE EXISTING BUILT UP ROOFING SYSTEM. RE FLASH 8 VENT STACKS. AS PER PLANS FILED HEREWITH.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 104214002/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 104214002/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990185:lapsed:DECIDE:f2bf737d4e

98 days late

lapsed

due June 10, 2026

counted from permit expiry

16 Clarkson Street, Manhattan

permit · job 104214137/02, permit PL, seq 02 · BIN 1009757

Was any plumbing work done at 16 CLARKSON STREET, MANHATTAN (job 104214137/02) after the permit expired on June 10, 2026?

The work this permit covers

REPLACE(2) H&V UNITS AND ONE EXHAUST FAN LOCATED AND PROVIDE DUCTWORK AND STEAM/CONDENSATE PIPING FOR THE EQUIPMENT. REPLACE ALL STEAM AND CONDENSATE PIPING. REPLACE ALL WALL-MOUNTED RADIATORS AND HEATING PIPE COILS IN THE BASEMENT. REMOVE AND RE-INSTALL(2)EXISTING AIR-COOLED SPLIT SYSTEMS IN COORDINATION WITH ROOF REPLACEMENT.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 02 is the newest issued for job 104214137/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-10
  • passjob openjob 104214137/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-10 (98 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 98 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990242:lapsed:DECIDE:bd7fbe713d

76 days late

lapsed

due June 30, 2026

counted from permit expiry

351 West 18th Street, Manhattan

permit · job 103652138/02, permit PL, seq 05 · BIN 1013096

Was any plumbing work done at 351 West 18th Street after June 30, 2025, when permit PL seq 05 expired?

The work this permit covers

REPLACE EXISTING ROOFTOP INTAKES/EXHAUSTS AND RELOCATE THREE OUTDOOR UNITS AS REQUIRED FOR ROOF REPLACEMENT. REPLACE 22 ROOF DRAINS AND 1 AREA DRAIN ON EXISTING ROUGHING. RELOCATE EXISTING VENT PENETRATIONS AWAY FROM PARAPET WALLS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 05 is the newest issued for job 103652138/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-30
  • passjob openjob 103652138/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-30 (76 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 76 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990918:lapsed:DECIDE:af284ff086

32 days late

lapsed

due August 13, 2026

counted from permit expiry

345 Chambers Street, Manhattan

permit · job 104214066/01, permit PL, seq 02 · BIN 1084587

Was any plumbing work done at 345 Chambers Street after August 13, 2025, when permit PL seq 02 expired?

The work this permit covers

M477 - REPLACEMENT OF TWO (2) 400 TON COOLING TOWER CELLS AND THREE (3) AIR HANDLERS INSTALLATION OF SECONDARY RPZ AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 02 is the newest issued for job 104214066/01 permit type PL
  • passexpiry knownexpiration date reads 2026-08-13
  • passjob openjob 104214066/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-13 (32 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 32 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992164:lapsed:DECIDE:86f0611aa7

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 12:44 UTC