Lapse
NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

5 cases of 53: lapsed or critical, draft ready, at Brooklyn, most overdue first.show all 53

The other 0 need an answer from you first and cannot be batched.

1,208 days late

lapsed

due May 25, 2023

counted from violation issued

4301 7 Avenue, Brooklyn

violation · type LBLVIO, violation V042523LBLVIO10409 · BIN 3011002

What DOB wrote on it

VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2023-04-25
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments present, no disposition date, category shows ACTIVE with no text indicating deletion, dismissal, or transfer. (confidence 0.95)
  • passcure path knownLow pressure boiler, inspection report not filed: Either provide proof the inspection report for that cycle year was already filed, or pay the civil penalty and file a current inspection report in DOB NOW: Safety. The report for a cycle can only be filed late until 14 January of the following year; after that DOB requires a fresh inspection for the current cycle.
  • passwithin action window2023-05-25 (1208 days ago), class lapsed, from a 30 day response window

The drafted response, in full

Files as Low pressure boiler annual inspection report in DOB NOW: Safety, plus the civil penalty

Violation V042523LBLVIO10409 (DOB ID 2623370) at 4301 7 Avenue, Brooklyn, issued April 25, 2023, remains open for failure to file the 2022 external low pressure boiler inspection for device 00009712. The violation lapsed its 30-day response window on May 25, 2023, over three years ago. The 2022 cycle report cannot be filed late after January 14, 2023, meaning that deadline passed before the violation was even issued. A current low pressure boiler inspection report for device 00009712 must be filed in DOB NOW: Safety, along with payment of the civil penalty for the original violation. If proof exists that the 2022 inspection report was already filed, provide that instead. The applicable rule is 1 RCNY §103-01: https://www.nyc.gov/assets/buildings/rules/1_RCNY_103-01.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2623370:lapsed:FILE

1,208 days late

lapsed

due May 25, 2023

counted from violation issued

4301 7 Avenue, Brooklyn

violation · type LBLVIO, violation V042523LBLVIO10410 · BIN 3011002

What DOB wrote on it

VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2023-04-25
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments present, no disposition date, category shows ACTIVE with no text indicating deletion, dismissal, or transfer. (confidence 0.95)
  • passcure path knownLow pressure boiler, inspection report not filed: Either provide proof the inspection report for that cycle year was already filed, or pay the civil penalty and file a current inspection report in DOB NOW: Safety. The report for a cycle can only be filed late until 14 January of the following year; after that DOB requires a fresh inspection for the current cycle.
  • passwithin action window2023-05-25 (1208 days ago), class lapsed, from a 30 day response window

The drafted response, in full

Files as Low pressure boiler annual inspection report in DOB NOW: Safety, plus the civil penalty

Violation V042523LBLVIO10410 (DOB ID 2623371) at 4301 7 Avenue, Brooklyn, issued April 25, 2023, remains open for failure to file the 2022 external low pressure boiler inspection for device 00009712. The violation lapsed its 30-day response window on May 25, 2023, over three years ago. The 2022 cycle report cannot be filed late after January 14, 2023, meaning that deadline passed before the violation was even issued. A current low pressure boiler inspection report for device 00009712 must be filed in DOB NOW: Safety, along with payment of the civil penalty for the original violation. If proof exists that the 2022 inspection report was already filed, provide that instead. The applicable rule is 1 RCNY §103-01: https://www.nyc.gov/assets/buildings/rules/1_RCNY_103-01.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2623371:lapsed:FILE

3 days late

lapsed

due September 11, 2026

counted from permit expiry

850 Grand Street, Brooklyn

permit · job 302582729/02, permit PL, seq 08 · BIN 3325733

The work this permit covers

EXTERIOR LIGHTING REPLACEMENT, REMOVE AND REINSTALLED ROOFTOP MECHANICAL, REPLACE MECHANICAL AS INDICATED, REPLACE ROOF DRAINS

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302582729/02 permit type PL
  • passexpiry knownexpiration date reads 2026-09-11
  • passjob openjob 302582729/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-11 (3 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 3 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T14:02:09+00:00). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302582729/02 permit PL seq 08 at 850 Grand Street, Brooklyn expired September 11, 2026. The work is exterior lighting replacement, remove and reinstall rooftop mechanical, replace mechanical as indicated, replace roof drains. The permit lapsed 3 days ago. Because no work was performed after the permit expired, DOB waives the unpermitted work penalty under 1 RCNY 102-04, so this is a clean renewal with the standard fee and no penalty to clear first. Renew it in DOB NOW: Build or eFiling before September 11, 2028 (730 days from expiration). A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office. The renewal fee is $130. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992811:lapsed:FILE:24d1cfcae8

2 days left

critical

due September 18, 2026

counted from permit expiry

101 Park Avenue, Brooklyn

permit · job 302580767/04, permit PL, seq 11 · BIN 3057942

The work this permit covers

P.S.265-K:REMOVE EXIST. 3"GAS SERVICE AT NORTH OXFORD ST.,INSTALL NEW 4"GAS SERVICE 2 METER ASSEMBIES AT PARK AVENUE,1 TEMP. ELECT.HWH,1 GAS FIRED HWH,1RPZ 1 DUMPLEX SUMP PUMP,2 CIRC.PUMPS,REPLACE 1 AREAWAY DRAINS &3 FD,2 NEW FD,NEW GAS VENTS.NEW GAS PIPING AND ASSOCIATED FITTINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 11 is the newest issued for job 302580767/04 permit type PL
  • passexpiry knownexpiration date reads 2026-09-18
  • passjob openjob 302580767/04 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-18 (in 2 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302580767/04 permit PL seq 11 at 101 PARK AVENUE, BROOKLYN expires September 18, 2026. The work is: P.S.265-K: REMOVE EXIST. 3"GAS SERVICE AT NORTH OXFORD ST., INSTALL NEW 4"GAS SERVICE 2 METER ASSEMBIES AT PARK AVENUE, 1 TEMP. ELECT. HWH, 1 GAS FIRED HWH, 1RPZ 1 DUMPLEX SUMP PUMP, 2 CIRC. PUMPS, REPLACE 1 AREAWAY DRAINS & 3 FD, 2 NEW FD, NEW GAS VENTS. NEW GAS PIPING AND ASSOCIATED FITTINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993023:critical:FILE:b3bc5ab934

6 days left

critical

due September 22, 2026

counted from permit expiry

207 Bushwick Avenue, Brooklyn

permit · job 302586645/02, permit PL, seq 06 · BIN 3071024

The work this permit covers

REMOVE AND REPLACE EXISTING ROOF MOUNTED CONDENSING UNIT AND INDOOR A/C UNIT. PROVIDE PRE-FAB ROOF CURBS, INSULATED REFRIGERANT AND DRAIN PIPING. REMOVE AND REPLACE ROOF DRAINS AND AREAWAY DRAINS WITH ASSOCIATED PIPING. REMOVE AND REPLACE EXISTING BOILER ROOM SUMP PUMP.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 302586645/02 permit type PL
  • passexpiry knownexpiration date reads 2026-09-22
  • passjob openjob 302586645/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-09-22 (in 6 days), class critical against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302586645/02 permit PL seq 06 at 207 BUSHWICK AVENUE, BROOKLYN expires September 22, 2026. The work is: REMOVE AND REPLACE EXISTING ROOF MOUNTED CONDENSING UNIT AND INDOOR A/C UNIT. PROVIDE PRE-FAB ROOF CURBS, INSULATED REFRIGERANT AND DRAIN PIPING. REMOVE AND REPLACE ROOF DRAINS AND AREAWAY DRAINS WITH ASSOCIATED PIPING. REMOVE AND REPLACE EXISTING BOILER ROOM SUMP PUMP. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993081:critical:FILE:4e82c51b11

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:12 UTC