NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

2 cases of 53: lapsed or critical, draft ready, at Queens, most overdue first.show all 53

The other 0 need an answer from you first and cannot be batched.

47 days late

lapsed

due July 29, 2026

counted from permit expiry

47-01 111th Street, Queens

permit · job 421628395/02, permit PL, seq 03 · BIN 4441124

The work this permit covers

HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK. INCLUDING KITCHEN RANGEHOOD VENTILATION SYSTEM AS PER PLANS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 421628395/02 permit type PL
  • passexpiry knownexpiration date reads 2026-07-29
  • passjob openjob 421628395/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-29 (47 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 47 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T13:28:50Z). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 421628395/02 permit PL seq 03 at 47-01 111th Street, Queens expired July 29, 2025. The work is mechanical and plumbing work including kitchen rangehood ventilation system as per plans. The permit lapsed 47 days ago but remains within the 730-day renewal window. Renew it in DOB NOW: Build or eFiling before the renewal window closes. If the scope has not changed, the permit applicant can renew through eFiling with the standard $130 renewal fee and no penalty; if anything changed, file a completed PW2 at the borough office. DOB waives the unpermitted work penalty where no work was performed after expiration. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3991806:lapsed:FILE:37c32155dd

34 days late

lapsed

due August 11, 2026

counted from permit expiry

60-85 Catalpa Avenue, Queens

permit · job 421901188/02, permit PL, seq 03 · BIN 4085173

The work this permit covers

INSTALLATION OF NEW TURF AND UNDER DRAINAGE. PARTIAL REPLACEMENT OF STORM DRAINAGE SYSEM IN PLAYGROUND.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 421901188/02 permit type PL
  • passexpiry knownexpiration date reads 2026-08-11
  • passjob openjob 421901188/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-11 (34 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 34 days ago against a 730 day renewal window
  • passanswered by[the contractor]No work was done after the permit expired (answered 2026-09-14T14:11:43Z). Where a permit (other than for temporary construction equipment) expired and no work was performed after the permit’s expiration.

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 421901188/02 permit PL seq 03 at 60-85 Catalpa Avenue, Queens expired August 11, 2025. The work is installation of new turf and under drainage, partial replacement of storm drainage system in playground. No work was performed after the permit expired. Renew this permit in DOB NOW: Build or eFiling before August 11, 2027. The standard renewal fee is $130. If the work changed, bring a completed PW2 to the borough office. DOB waives the unpermitted work penalty where nothing was done after expiration. https://www.nyc.gov/assets/buildings/rules/1_RCNY_102-04.pdf

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992086:lapsed:FILE:9d64e889bc

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC