Lapse
NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

13 cases of 53: lapsed or due or carrying no class, your call, at Brooklyn, most overdue first.show all 53

110 days late

lapsed

due May 29, 2026

counted from permit expiry

133 Navy Walk, Brooklyn

permit · job 340111765/01, permit PL, seq 09 · BIN 3257041

Was any plumbing work done at 133 NAVY WALK, BROOKLYN (job 340111765/01) after the permit expired on May 29, 2026?

The work this permit covers

LAUNDRY ROOM UPGRADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 09 is the newest issued for job 340111765/01 permit type PL
  • passexpiry knownexpiration date reads 2026-05-29
  • passjob openjob 340111765/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-05-29 (110 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 110 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3989946:lapsed:DECIDE:8f7987a4d0

106 days late

lapsed

due June 2, 2026

counted from permit expiry

1137 Herkimer Street, Brooklyn

permit · job 302575844/03, permit PL, seq 09 · BIN 3042157

Was any plumbing work done at 1137 HERKIMER STREET, BROOKLYN (job 302575844/03) after the permit expired on June 2, 2026?

The work this permit covers

K271-REPLACE SUMP PUMPS,PORTIONS OF CW/HW ,WASTE & STORM PIPING, GAS, S/W PIPING.REPLACE ELECTRIC HWH & RELATED PIPING, GAS METER ASSEMBLY.REMOVE HW STEAM COIL STORAGE TANK & ASSOC PIPING/CONTROLS, CIRCULATING PUMP & ASSOC PIPING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 09 is the newest issued for job 302575844/03 permit type PL
  • passexpiry knownexpiration date reads 2026-06-02
  • passjob openjob 302575844/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-02 (106 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 106 days ago against a 730 day renewal window
  • failanswer still appliesanswered 'no' on 2026-09-14T14:04:57Z against a different reading of this permit; DOB's record has moved since, so the question stands again
recorded, and you can change it

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990014:lapsed:DECIDE:186c2487e3

102 days late

lapsed

due June 6, 2026

counted from permit expiry

760 Prospect Place, Brooklyn

permit · job 322050230/02, permit PL, seq 03 · BIN 3330794

Was any plumbing work done at 760 PROSPECT PLACE, BROOKLYN (job 322050230/02) after the permit expired on June 6, 2026?

The work this permit covers

REPLACE AREAWAY DRAINS AND PIPES, REPLACE SUMP PUMPS IN CELLAR, REPLACE DETERIORATED SANITARY/STORM WATER PIPES, REPLACE FAN, FAN SUPPORT AND PHLENUM ON ROOF, REPLACE RADIATOR AND CONDENSATE PIPES IN BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 322050230/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-06
  • passjob openjob 322050230/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-06 (102 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 102 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990188:lapsed:DECIDE:7ba026ad24

96 days late

lapsed

due June 12, 2026

counted from permit expiry

65 Court Street, Brooklyn

permit · job 302574925/02, permit PL, seq 07 · BIN 3002557

Was any plumbing work done at 65 COURT STREET, BROOKLYN (job 302574925/02) after the permit expired on June 12, 2026?

The work this permit covers

REMOVE AND REPLACE EXISTING INSULATION WITH NEW, WITHIN FRESH AIR INTAKE SHAFT. PROVIDE HEAT TRACING FOR PIPING WITHIN FRESH AIR INTAKE SHAFT. EXTEND EXISTING FAI FOR SEWER EJECTOR PIT.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 302574925/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-12
  • passjob openjob 302574925/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-12 (96 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 96 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990374:lapsed:DECIDE:7ccbc1ac25

89 days late

lapsed

due June 17, 2026

counted from permit expiry

101 Park Avenue, Brooklyn

permit · job 322050668/02, permit PL, seq 04 · BIN 3057942

Was any plumbing work done at 101 Park Avenue after June 17, 2025, when permit PL seq 04 expired?

The work this permit covers

REPLACE ROOFING OF SELETIVE ROOFS AND 9 ROOFS/CANOPIES DRAINS, REPAIR BRICK MA SONRY PARAPET WALLS AND METAL COPING, MASONRY FACADE REPOINTING, REPLACE/ REPA IR SHELF ANGLES AND WINDOWS LINTELS AND SILLS. REPLACE BRICK MASONRY ENCLOSER OF EXIST, CHIMENY FROM ROOF SLAB AND ABOVE, REPLACE BASEMENT FLOORING, REPLAC E CONCRETE PAVEMENT AND RAILING.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 322050668/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-17
  • passjob openjob 322050668/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-17 (89 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 89 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990520:lapsed:DECIDE:350f6d9d24

86 days late

lapsed

due June 20, 2026

counted from permit expiry

6302 Avenue U, Brooklyn

permit · job 302582104/01, permit PL, seq 08 · BIN 3326821

Was any plumbing work done at 6302 Avenue U after June 20, 2025, when permit PL seq 08 expired?

The work this permit covers

EXTERIOR BUILDING REHABILITATION. ROOF REPLACEMENT. SELECTIVE REPLACEMENT OF PARAPETS AND FACE BRICK. REPLACEMENT OF SECURITY LIGHTING IN AREAS OF WORK. ASSOCIATED INTERIOR REPAIRS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302582104/01 permit type PL
  • passexpiry knownexpiration date reads 2026-06-20
  • passjob openjob 302582104/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-20 (86 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 86 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990596:lapsed:DECIDE:b7578f3edc

86 days late

lapsed

due June 20, 2026

counted from permit expiry

31 New York Avenue, Brooklyn

permit · job 322053326/02, permit PL, seq 04 · BIN 3053993

Was any plumbing work done at 31 New York Avenue after June 20, 2025, when permit PL seq 04 expired?

The work this permit covers

REMOVE AND REPLACE ROOF EXHAUST FANS AND VENTILATORS WITH DAMPERS. REMOVE AND REINSTALL CODENSING TO ACCOMODATE MASONRY WORK. PROVIDE TEMP SPOT COOLER. CLEAN, TEST DRAIN, REMOVE OBSTRUCTIONS IN EXISTING STORM DRAIN PIPING FROM ROOF TO STREET MAIN. REMOVE AND REPLACE ROOF DRAIN ASSEMBLY.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 04 is the newest issued for job 322053326/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-20
  • passjob openjob 322053326/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-20 (86 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 86 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990597:lapsed:DECIDE:aa242603ec

83 days late

lapsed

due June 23, 2026

counted from permit expiry

6302 Avenue U, Brooklyn

permit · job 302574042/02, permit PL, seq 08 · BIN 3326821

Was any plumbing work done at 6302 Avenue U after June 23, 2025, when permit PL seq 08 expired?

The work this permit covers

PS 236- REPLACEMENT OF (1) DRINKING FOUNTAIN, 10' STORM DRAINAGE PIPING. REMOVE PORTION OF COLD WATER AND SANITARY PIPING. NEW TRENCH DRAINS, CATCH BASINS & DETENTION TANKS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302574042/02 permit type PL
  • passexpiry knownexpiration date reads 2026-06-23
  • passjob openjob 302574042/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-06-23 (83 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 83 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990685:lapsed:DECIDE:6afd3003f6

75 days late

lapsed

due July 1, 2026

counted from permit expiry

7115 15 Avenue, Brooklyn

permit · job 322050711/03, permit PL, seq 03 · BIN 3157760

Was any plumbing work done at 7115 15 Avenue after July 1, 2025, when permit PL seq 03 expired?

The work this permit covers

REPLACE 6 SCUPPERS WITH STORM LEADERS, REPLACE 4 ROOF DRAINS AND 9 LIGHT FIXTURES

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 03 is the newest issued for job 322050711/03 permit type PL
  • passexpiry knownexpiration date reads 2026-07-01
  • passjob openjob 322050711/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-07-01 (75 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 75 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3990975:lapsed:DECIDE:1767ef9029

26 days late

lapsed

due August 19, 2026

counted from permit expiry

450 Pacific Street, Brooklyn

permit · job 321068214/01, permit PL, seq 06 · BIN 3001183

Was any plumbing work done at 450 Pacific Street after August 19, 2025, when permit PL seq 06 expired?

The work this permit covers

REPLACE ROOF DRAINS, REPAIR MECHANICAL ROOF VENTS, IN CONJUNCTION WITH PREVIOUSLY APPROVED PROJECT DOB# 302586690.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 06 is the newest issued for job 321068214/01 permit type PL
  • passexpiry knownexpiration date reads 2026-08-19
  • passjob openjob 321068214/01 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-08-19 (26 days ago), class lapsed against a 30 day action window
  • passrenewable after lapselapsed 26 days ago against a 730 day renewal window

Answering sends nothing and renews nothing. It puts the one fact Lapse cannot read anywhere on the record, and the next pass works out which filing is right and drafts it for you to approve.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3992297:lapsed:DECIDE:5e835badc7

no clock on this one

no class

no date on record

271 Melrose Street, Brooklyn

violation · type C, violation V041725CSR30401MA · BIN 3071962

When is the response due for construction violation V041725CSR30401MA at 271 Melrose Street?

What DOB wrote on it

FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND/OR APPURTANCES IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 1 AND 3 MISSING FACADE PANNELS. REMEDY: REPAIR AND/OR REPLACE

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2025-04-17
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation
now tracked to December 13, 2026

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2790961:none:DECIDE:3f75160e46

no clock on this one

no class

no date on record

271 Melrose Street, Brooklyn

violation · type C, violation V102224CSR30402DO · BIN 3071962

When is the response due for construction violation V102224CSR30402DO at 271 Melrose Street?

What DOB wrote on it

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECITON OBSERVED MISSIN GPANNEL AT EXPOSURE ONE AT PARAPET WALL CENTER OF BUILDING OBSERVED ONE COVERED BY PLYWOOD. AT EXPOSURE #3 OBSERVED MISSING PANNEL NEAR PARAPET WALL. REMEDY: REPAIR AND/OR REPLACE

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2024-10-22
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2783447:none:DECIDE:e29f7e8d09

no clock on this one

no class

no date on record

2052 Fulton Street, Brooklyn

violation · type C, violation V100924CFEU30501BS · BIN 3042157

When is the response due for construction violation V100924CFEU30501BS at 2052 Fulton Street?

What DOB wrote on it

FAILURE TO MAINTAIN.BLDG LEANING APPRX6" TO 8"@TOP,W/LEAN TO EXP4 THAT BEGIN ON 1ST STORY&CONTINUES TO TOP STORY.COSMETIC RPAIRS W/O PRMT OBSRVD SINCE 2023.RECEVNG WALL@EXP4(WEST) SIDE OF BLDG INTACT.1.FULLY VACATE BLDG UNTIL RPAIRS ARE CMPLTD UNDR PRMT,2.IMMED RTAIN NYSPE STRCTRL ENG TO EVAL ENT BLDG,3.FILE FOR RPAIRS

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2024-10-09
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2783719:none:DECIDE:3419825048

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:52 UTC