Lapse
NYC Open DataVarsity Plbg and Htg Inc
Duty officerVarsity Plbg and Htg IncLIVE · synced 2026-09-14 13:40 UTC

53 decisions are yours.

33 already past their date, the worst by 1,208 days late

The overnight pass did the reading. 235 items screened, 179 held without a word.

1,208 days late is the worst of them: type LBLVIO, violation V042523LBLVIO10409 at 4301 7 Avenue, Brooklyn. A response is drafted and waiting on you.

What is due, and when

5 cases of 53: due or carrying no class, draft ready or your call, at Brooklyn, most overdue first.show all 53

The other 3 need an answer from you first and cannot be batched.

24 days left

due

due October 10, 2026

counted from permit expiry

1037 East 54th Street, Brooklyn

permit · job 302586663/02, permit PL, seq 07 · BIN 3214729

The work this permit covers

REMOVE & REPLACE EXISTING BOILERS & BURNERS W/ HIGH EFFICIENCY, MODULATING, GAS FIRED UNITS. REPL. AUX. SYSTEMS SERVING THE BOILERS. REPLACE BRANCH STEAM CONTROL VALVES, LOCAL CTRL. VALVES AT RADIATORS THROUGHOUT THE BLDG. PLUMBING AT BAS & BOILER RM. INSTALL/ OF (5) RPZ/BACKFLOW PRV. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED THIS APPLICATION

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 07 is the newest issued for job 302586663/02 permit type PL
  • passexpiry knownexpiration date reads 2026-10-10
  • passjob openjob 302586663/02 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-10-10 (in 24 days), class due against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302586663/02 permit PL seq 07 at 1037 EAST 54TH STREET, BROOKLYN expires October 10, 2026. The work is: REMOVE & REPLACE EXISTING BOILERS & BURNERS W/ HIGH EFFICIENCY, MODULATING, GAS FIRED UNITS. REPL. AUX. SYSTEMS SERVING THE BOILERS. REPLACE BRANCH STEAM CONTROL VALVES, LOCAL CTRL. VALVES AT RADIATORS THROUGHOUT THE BLDG. PLUMBING AT BAS & BOILER RM. INSTALL/ OF (5) RPZ/BACKFLOW PRV. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED THIS APPLICATION. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993521:due:FILE:5db547bdd9

28 days left

due

due October 14, 2026

counted from permit expiry

5800 Tilden Ave, Brooklyn

permit · job 302586583/03, permit PL, seq 08 · BIN 3104598

The work this permit covers

K415 - FILING HEREWITH PLUMBING MODIFICATIONS TO REPLACE YARD DRAIN AND ASSOCIATED PIPING, PROVIDE NEW TRENCH DRAIN, REPLACE ROOF DRAINS AND RE-FLASH VENT STACKS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

What the engine checked

  • passpermit livepermit status is ISSUED
  • passnot supersededsequence 08 is the newest issued for job 302586583/03 permit type PL
  • passexpiry knownexpiration date reads 2026-10-14
  • passjob openjob 302586583/03 is PERMIT ISSUED - ENTIRE JOB/WORK
  • passrenewal path knownPlumbing permit: Renew it in the system it was issued in, DOB NOW: Build or eFiling, before the expiry date. A renewal without change goes through eFiling by the permit applicant; a renewal with change needs a completed PW2 at a borough office.
  • passwithin action window2026-10-14 (in 28 days), class due against a 30 day action window

The drafted response, in full

Files as DOB NOW: Build or eFiling permit renewal, PW2 if anything changed, $130 renewal fee

Job 302586583/03 permit PL seq 08 at 5800 TILDEN AVE, BROOKLYN expires October 14, 2026. The work is: K415 - FILING HEREWITH PLUMBING MODIFICATIONS TO REPLACE YARD DRAIN AND ASSOCIATED PIPING, PROVIDE NEW TRENCH DRAIN, REPLACE ROOF DRAINS AND RE-FLASH VENT STACKS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. Renew this plumbing permit in the system it was issued in (DOB NOW: Build or eFiling) before expiry. A renewal without change goes through eFiling by the permit applicant. A renewal with change requires a completed PW2 at a borough office. The renewal fee is $130. Rule: https://www.nyc.gov/site/buildings/property-or-business-owner/permit-renewal.page

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data ipu4-2q9apermit:3993564:due:FILE:e250be9a7b

no clock on this one

no class

no date on record

271 Melrose Street, Brooklyn

violation · type C, violation V041725CSR30401MA · BIN 3071962

When is the response due for construction violation V041725CSR30401MA at 271 Melrose Street?

What DOB wrote on it

FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND/OR APPURTANCES IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 1 AND 3 MISSING FACADE PANNELS. REMEDY: REPAIR AND/OR REPLACE

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2025-04-17
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation
now tracked to December 13, 2026

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2790961:none:DECIDE:3f75160e46

no clock on this one

no class

no date on record

271 Melrose Street, Brooklyn

violation · type C, violation V102224CSR30402DO · BIN 3071962

When is the response due for construction violation V102224CSR30402DO at 271 Melrose Street?

What DOB wrote on it

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECITON OBSERVED MISSIN GPANNEL AT EXPOSURE ONE AT PARAPET WALL CENTER OF BUILDING OBSERVED ONE COVERED BY PLYWOOD. AT EXPOSURE #3 OBSERVED MISSING PANNEL NEAR PARAPET WALL. REMEDY: REPAIR AND/OR REPLACE

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2024-10-22
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2783447:none:DECIDE:e29f7e8d09

no clock on this one

no class

no date on record

2052 Fulton Street, Brooklyn

violation · type C, violation V100924CFEU30501BS · BIN 3042157

When is the response due for construction violation V100924CFEU30501BS at 2052 Fulton Street?

What DOB wrote on it

FAILURE TO MAINTAIN.BLDG LEANING APPRX6" TO 8"@TOP,W/LEAN TO EXP4 THAT BEGIN ON 1ST STORY&CONTINUES TO TOP STORY.COSMETIC RPAIRS W/O PRMT OBSRVD SINCE 2023.RECEVNG WALL@EXP4(WEST) SIDE OF BLDG INTACT.1.FULLY VACATE BLDG UNTIL RPAIRS ARE CMPLTD UNDR PRMT,2.IMMED RTAIN NYSPE STRCTRL ENG TO EVAL ENT BLDG,3.FILE FOR RPAIRS

What the engine checked

  • passcategory activeDOB categorises this as 'V-DOB VIOLATION - ACTIVE'
  • passnot disposedDOB has recorded no disposition date
  • passissue date knownissued 2024-10-09
  • passoutstanding by text[claude-sonnet-4-5-20250929]No disposition comments and no disposition date. Category is V-DOB VIOLATION - ACTIVE. Nothing indicates this has been resolved. (confidence 0.95)
  • passcure path knownConstruction violation: Correct the condition and give proof of the correction to the unit that issued it, and pay any DOB civil penalty. There is no court appearance on a DOB violation, and there is no published number of days, so how fast this moves is set by the job rather than by a rule.
  • passcontractor is respondentthe city names the either on a Construction violation

DOB publishes a cure path for this one and no deadline, so Lapse will not invent a date and this clock is yours to set. Once it is set, Lapse tracks it like any other deadline and goes quiet until it is close. Nothing is sent.

the published rule this deadline comes fromDOB record on a810-bisweb.nyc.govOpen Data 3h2n-5cm9violation:2783719:none:DECIDE:3419825048

What ran while nobody was watching

all 23 passes on record
FinishedPassScreenedHeldOpenedDraftedAskedFiledVetoed
2026-09-16 11:04 UTC2 days agosingle case filing140 permits, 95 violations23517925151144
2026-09-15 11:04 UTC3 days agosingle case filing140 permits, 95 violations2351792517955
2026-09-14 14:12 UTC4 days agosingle case filing140 permits, 95 violations23517911000
2026-09-14 14:05 UTC4 days agosingle case filing140 permits, 95 violations23517911000

That pass classed 127 dated items across the whole portfolio:33 lapsed4 critical10 due80 clear

Configured cadence: EventBridge schedule lapse-daily, cron(0 11 * * ? *) UTC, reported ENABLED against function lapse-run. That is the EventBridge schedule the deploy script writes, read out of this deployment's configuration. What it has actually done is the table, not this line.

Already closed

Lapse deadline sheetDOB · NYC Open Data
Read from
lapse-cases, us-east-1
Partition
VARSITY PLBG AND HTG INC
Rows
58 cases, 23 run records
Read at
2026-09-18 13:49 UTC